Migrating a collaborative project from a previous minor version to Neotys Design Studio 5.5 is somehow different from upgrading a standard project. The migration process consists in two steps:

  1. One team member migrates the project onto the collaboration server. Then, the local project must be migrated.
  2. The other team members check out the remote migrated project from the collaboration server.

In This Section

Migrate a collaborative project

Check out locally a remote project already migrated