Migrating a collaborative project from a previous minor version to Neotys Design Studio 5.5 is somehow different from upgrading a standard project. The migration process consists in two steps:
One team member migrates the project onto the collaboration server. Then, the local project must be migrated.
The other team members check out the remote migrated project from the collaboration server.
Warning: A collaborative project is migrated once for all. As the migrated project can be opened in Neotys Design Studio 5.5 only, it is advised to make a backup copy of the source project before upgrading the project. For more information, see Export a project.